Want to pass your Avaya IP Telephony Design Elective Exam 132-S-900.7 exam in the very first attempt? Try Pass2lead! It is equally effective for both starters and IT professionals.
VCE
A client is implementing an S87xx Media Server with several G650 Media Gateways. They are concerned with overheating in the equipment room, especially in the equipment power units. Which two conditions cause a G650 power supply to initiate an emergency shutdown? (Choose two.)
A. overvoltage
B. overheating
C. undervoltage
D. high humidity
You have a corporate site with an S87xx Media Server in location A, and a remote site with an G700/ S8300 LSP processor in Location B. The WAN connection goes down. In what sequence will the G700 register with the S8300?
A. Each H.248 gateway will reboot and register with the S8300 LSP when it comes back up.
B. The S8300 LSP processor reboots, and then notifies each H.248 gateway it is now the primary call processor.
C. The S8300 LSP processor notifies each H.248 gateway in the media controller list that it is now the primary call processor.
D. Each H.248 gateway will detect that the S87xx Media Server is not available and will reregister with the next Media Server in the media controller list.
A customer is interested in having a VPN gateway such as a security gateway as part of their remote office solution. Where in the existing network can VPN Service Units (VSU) be placed? (Choose two.)
A. Behind an access router
B. Behind an Avaya Media Server
C. In parallel with an existing firewall
D. In parallel with an Ethernet switch