Fractional Factorial Designs are used to analyze factors to model the output as a function of inputs if Hypothesis Testing in the Analyze Phase was inadequate to sufficiently narrow the factors that significantly impact the output(s).
A. True
B. False
When the Inputs, X's, for your process are Normally Distributed about the Mean, the Outputs, Y's, will always be Normally Distributed.
A. True
B. False
Situations where standardized work needs to be incorporated include all of these except _____________________.
A. Changeover instructions incomplete
B. Lack of a system to assure proper inventory levels at repair stations
C. Machines continually operating to reduce the labor cost per piece
D. Process flow for the same product assembly taking various cycle time for completion
Data that can be measured on a continuum and has meaningful decimal subdivisions are __________ data.
A. Continuous
B. Surplus
C. Discrete
D. Variable
A Belt has determined that the inventory of repair parts at a rework station can be reduced by 45%.
According to Cost of Poor Quality (COPQ) definitions inventory reduction would be considered _______________.
A. Soft Savings
B. COPQ efficiency
C. Median Savings
D. Hard Savings
A valuable tool to use during the Measure Phase to show material and information flow throughout an entire process is the ______________ .
A. Value Stream Map
B. FMEA
C. Pareto Chart
D. Standard Operating Procedure
The Lean toolbox includes all of these items except ________________.
A. Mistake Proofing
B. Visual Factory
C. Design of Experiments
D. Inventory Management
Which statement(s) are correct about the Regression shown here? (Note: There are 2 correct answers).

A. The dependent variable is the outside temperature
B. The relationship between outside temperature and number of customers per hour is a Linear Regression
C. The dashed lines indicate with 95% confidence where all of the process data should fall between
D. The dashed lines indicate with 95% confidence the estimate for the Quadratic Regression Line
E. The predicted number of customers per hour is close to 5 if the outside temperature is 10 deg C
Modern quality management recognizes the importance of all the following except:
A. Customer satisfaction
B. Inspection over prevention
C. Continuous improvement
D. Management responsibility
Which of the following does not come under the tools and techniques for a project charter?
A. Expert judgment
B. Project management information system
C. Organizational process assets
D. Project management methodology