Want to pass your Planning and Administering Microsoft Azure for SAP Workloads AZ-120 exam in the very first attempt? Try Pass2lead! It is equally effective for both starters and IT professionals.
VCE
You have an SAP production landscape that uses SAP HANA databases on Azure.
You need to deploy a disaster recovery solution to the SAP HANA databases. The solution must meet the following requirements:
1.
Support failover between Azure regions.
2.
Minimize data loss in the event of a failover. What should you deploy?
A. Azure Site Recovery
B. Always On availability group
C. HANA system replication that uses asynchronous replication
D. HANA system replication that uses synchronous replication
You migrate an on-premises instance of SAP NANA that runs SUSE Linux Enterpnse Server (SLES) to an Azure virtual machine.
You project that in two years, you will replace the virtual machine with a larger virtual machine within the same flexibility group.
You need to recommend solutions to minimize HANA deployment costs during the next three years. The solutions must not affect the availability SLAs.
Which two solutions should you recommend? Each correct answer presents a complete solution
NOTE: Each correct selection is worth one point.
A. a three-year reservation that has instance size flexibility
B. a one-year reservation that has instance size flexibility
C. a one-year reservation that has capacity priority
D. Azure Hybrid Benefit
E. Azure Spot instance
HOTSPOT
You have an on-premises SAP environment. Application servers run on SUSE Linux Enterprise Server (SLES) servers. Databases run on SLES servers that have Oracle installed.
You need to recommend a solution to migrate the environment to Azure. The solution must use currently deployed technologies whenever possible and support high availability.
What should you include in the recommendation? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area: