You want to setup integrated planning for your internal order. What do you need to do? Note: There are 2 correct answers to this question.
A. Set the relevant indicators in the CO version.
B. Set the relevant indicator in the controlling area.
C. Set the relevant indicator in the planning profile of the order type.
D. Set the relevant indicator in the internal order master record.
What master data objects can you set up using time-based fields? Note: There are 2 correct answers to this question.
A. Cost centers
B. Statistical key figures
C. Activity type
D. Cost element
You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirements must be fulfilled? Note: There are 2 correct answers to this question.
A. Costing-based Profitability Analysis must be active.
B. Account-based Profitability Analysis must be active.
C. The type of the addressed ledger must be an extension ledger.
D. The type of the general ledger account must be primary cost/revenue or secondary cost.
You want to use template to consider overhead during product costing. How do you assign the template to your material?
A. Using an overhead group and an overhead key
B. Using a profit center and an overhead key
C. Using an origin group and an overhead group
D. Using a special procurement type and an overhead group
How do you maintain number range intervals in Controlling?
A. By account type
B. By cost element category
C. By business transactions
D. By document type
You post a billing document for a sales order with sales order controlling. What data flows to Profit Center Accounting? Note: There are 2 correct answers to this question.
A. Sales deductions
B. Order quantity
C. Payment Discount
D. Revenues
Which processes split costs into their primary cost components? Note: There are 2 correct answers to this question.
A. Execution of the assessment cycles
B. Business process price calculation
C. Settlement of internal orders
D. Cost center/activity type price calculation
You have implemented Product Cost by Sales Oder in conjunction with cost-based POC results analysis in your organization.
For a particular sales order item, you have the following:
Plan revenue = 3000; Plan costs = 2000
Actual revenue = 1200; Actual cost=1000
What data does the system calculate during results analysis?
A. "Revenue = 1500; Cost of sales = 1000; Revenue surplus =300"
B. "Revenue = 1200; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 200"
C. "Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 300"
D. "Revenue = 1200; Cost of sales = 1000; Revenue surplus =200"
You have implemented Product Cost by Sales Oder in conjunction with revenue-based results analysis in your organization.
For a particular sales order item, you have the following:
Plan revenue = 3000; Plan costs = 2000
Actual revenue = 1200; Actual costs = 1000
What data does the system calculate during results analysis?
A. Revenue = 1200; Cost of sales = 800; Reserve = 200
B. Revenue = 1200; Cost of sales = 1000; Reserve = 200
C. Revenue = 1200; Cost of sales = 1000; WIP = 200 D. Revenue = 1200; Cost of sales = 800; WIP = 200
You are implementing SAP S/4HANA and you want to run analytical reports off a single data model. Which statement best describes reporting in SAP S/4HANA?
A. Reporting can be either broad and deep for analysis, or speedy and simple, but not both.
B. Reporting on data in real time is difficult, and complex to design.
C. Reporting on data is available in real-time at every level of detail.
D. Reporting analytical data is always done in a business warehouse system.