Which of the following scheduling types can only be used in capacity planning?
A. Midpoint
B. Forward
C. Only capacity requirements
D. Backward
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)
A. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.
B. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
C. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
D. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
During the processing of production orders planned and actual costs are determined. On which of the following objects can you collect these costs? (Choose two)
A. Production order
B. Product cost collector
C. Work center
D. Planned order
When modeling in-house production using SAP ECC, on which business levels can you create a bill of material (BOM)? (Choose two)
A. At the company code level
B. At the plant level
C. At the business area level
D. At the client level
What functions can you use for sub operations? (Choose two)
A. Costing
B. Material component allocation
C. Production/Resource tools allocation
D. Capacity planning
What sequence do you follow in master data maintenance to define the production of a material?
A. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
B. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
C. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
D. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
Which property applies for consumption with planning strategy 40 (planning with final assembly)?
A. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
B. Consumption takes place with the planning material.
C. Consumption can reduce the total originally planned production quantity.
D. Consumption can increase the total originally planned production quantity.
Which option for selecting a routing exists when you create a production order?
A. Automatic selection of a reference operation set
B. Manual selection based on settings in the order type-dependent parameters
C. Automatic selection based on the selection ID in the material master
D. Manual selection based on the list of routings maintained in the material master
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
How is the resulting firming interval specified in this scenario?
A. By the planning time fence from the material master
B. By the firming mechanism with the longer firming interval
C. By the manual firming date
D. It is predefined in Customizing.
Which activity can trigger an automatic availability check for the components of a production order?
A. Material staging
B. Order rescheduling
C. Order release
D. Goods receipt for a missing part