You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion?
Note: There are 3 correct answers to this question.
A. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
B. Unicode conversion SAP S/4HANA conversion including database migration
C. Unicode conversion SAP S/4HANA conversion without database migration Database migration
D. SAP S/4HANA conversion including database migration and Unicode conversion
E. Unicode conversion Database migration SAP S/4HANA conversion without database migration
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
A. The path was stored in file host_profile during registration
B. The path was stored to the environment of user
C. The path is taken from the URL entered in the browser to start SUM
D. The path was stored in file sumabap conf during registration
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)? There are 2 correct answers to this question.
A. During downtime
B. During SPDD
C. Post-downtime
D. During uptime
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?
A. Using R3load and network socket connection
B. Using R3load and memory pipes
C. Using R3load and file transfer
D. Using work processes and network socket connection
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
A. Run the database migration to the SAP HANA database
B. Perform the migration of data into the new data structure
C. Check the compatibility of custom code with SAP S/4HANA
D. Apply the recommendations of the simplification list
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime- optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
A. Software update
B. Conversion
C. Main import
D. Migration
In ICNV. How database operations synchronized between the source and the target table?
A. Deletes are directly executed in the target table by delete trigger.
B. AA
You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.
A. Modification adjustment (SPAU)
B. Modification adjustment (SPDD)
C. Activation of dictionary objects (ACT_UPG)
D. Conversion of application tables (PARCONV_UPG)
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question
A. Upgrade the SAP system
B. Perform an SAP S/4 HANA conversion without DMO
C. Perform an SAP S/4 HANA conversion including DMO
D. Apply SAP support packages
E. Use DMO for SUM
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
A. To optimize the migration
B. To optimize the activation
C. To optimize the conversion
D. To optimize the main import