HOTSPOT
As a part of troubleshooting, you have to reinstall the same version of the firmware on an HPE Synergy Compute Module. Click the area within the Firmware section of the server profile that will allow you to install the same firmware version.
Hot Area:

Which statement about a server profile for an Apollo system is true?
A. Enclosure Group is automatically selected
B. Fibre Channel connections can be defined
C. UEFI optimized is the only available boot mode
D. Virtual WWNs an MAC addresses can be defined
Your customer runs VMware ESXi on an HPE Synergy platform. The ESXi systems must have access to 50 VLANs initially. However, this is a dynamic environment, and more VLANs will be added in the future.
They want to add more networks for virtual machines, but they do not want to modify the HPE Virtual Connect configuration.
Which type of the network should the customer define?
A. Untagged
B. Internal
C. Tunnel
D. Tagged
You are creating a Logical Interconnect Group for a three-frame HPE Synergy solution with HPE Virtual Connect SE100Gb F32 Modules for Synergy.
In which scenario should you set redundancy for master modules to be highly available?
A. When storm control or loop protection will be enabled for Virtual Connect modules
B. When each of the frames has two Virtual Connect modules installed
C. When each Virtual Connect module is installed in different frame
D. When each Virtual Connect module is installed in different fabric
Your customer wants to manage their HPE Superdome Flex using HPE OneView. Which component must be added to HPE OneView to accomplish this task?
A. Baseboard Management Controller (BMC)
B. Rack Management Controller (RMC)
C. all nPARs created within the complex
D. only the base chassis from the complex
Which parameters can be defined in a server profile template for HPE Synergy Compute Modules? (Select two.)
A. partition layout for servers running Linux.
B. IL0 IPv4 or IPv6 address.
C. local storage and BIOS settings.
D. NIC teaming setup at OS level.
E. network and storage connectivity.
You try to add an HPE Primera array to HPE OneView, but you get a connectivity error. However, you can connect to the array using SSMC. What should you verify before adding HPE Primera to HPE OneView?
A. whether WSAPI service is enabled on HPE Primera array.
B. whether the appropriate license for HPE Primera Is available in HPE OneView.
C. whether array management using HPE OneView is enabled in SSMC.
D. whether there are at least two Fibre Channel networks defined in HPE OneView.
You are creating a Logical Interconnect Group (LIG) that will be used to configure SAS connectivity. What is the maximum number of frames that can be inducted in this LIG?
A. 2 frames
B. 4 frames
C. 3 frames
D. 1 frame
E. 5 frames
What is required to add a remote frame to the primary management ring?
A. UUD of the remote HPE Composer
B. Serial number of one of the remote frames
C. Remote frame Link Module IPv6 address
D. Request code from the primary HPE Composer
Which operation can be performed using HPE OneView for VMware vCenter Server?
A. Remove a new node from an existing cluster
B. Create a new VMware cluster within vCenter Server
C. Configure VMware cluster properties tor HA and DRS
D. Create a new distributed switch for cluster connectivity