You need to create the production orders for standard model bicycles. Which method should you use?
A. Sales order line
B. Master planning execution
C. Supply schedule form
D. Released item
E. All production orders form
You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item. Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A. Assign it a Serial number group with per qty. defined as 1.
B. Assign the item a Tracking dimension group with active serial number control.
C. Create an inter-class unit of measure conversion between boxes and carats.
D. Assign a Tracking dimension group with batch number as the only active tracking dimension.
A company uses cost groups to track calculated costs of items preassembled by vendors.
The company needs to analyze service costs for each vendor's preassembled items.
You need to assign the cost group type to the preassembled items.
Which costs should you assign?
A. Direct material
B. Indirect
C. Direct manufacturing
D. Direct outsourcing
A client subcontracts production work to a vendor for production operations.
You need to model subcontracting of route operations in production orders.
Solution: Ensure that the material routing process is independent of the services procurement process.
Does the solution meet the goal?
A. Yes
B. No
You use the master planning module for Dynamics 365 Supply Chain Management.
Planned production orders have been created.
Several sales orders are canceled in response to concerns about recent online reviews of a product.
You need to enable the appropriate action message.
Which action message should you enable?
A. Increase
B. Decrease
C. Advance
D. Postpone
E. Derived actions
A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.
An employee discovers an error after a time and attendance record is approved and transferred. The payroll transfer has not been run. However, the time has been posted against the production order.
You need to reverse the transferred registrations.
What happens to the production order time posting?
A. The Production Report as Finished journal is posted.
B. Transactions are offset and neutralized.
C. Negative values are offset through manual posting.
D. The production order is ended.
You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company.
It is the end of the year and the labor rates have been recalculated based on new salary data. You need to update the effective labor costs for all labor groups.
Which element must be updated?
A. cost groups
B. cost category
C. resource group
D. shared category
E. production orders
HOTSPOT
You need to meet the needs for the large teakwood furniture order.
What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:

HOTSPOT
You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:

DRAG DROP
You need to implement the scheduled Kanban requirements.
Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:
