Which equipment is standard in a new ACP 4200 4.0?
A. IP 7254
B. VSP 4850
C. IP 8284
D. VSP 7024
A support engineer is upgrading a PodFX 3.1 system to ACP 4200 4.0, and is upgrading the VMware vCenter Server from Release 6.0 to Release 6.5.
Which three tasks are required as part of the upgrade process? (Choose three.)
A. Replace the old HP server with a new HP DL360 D10 server.
B. Identify the IP address and root account credentials of the ESXi host where the current vCenter Server appliance resides.
C. Obtain the VMware vCenter Server 6.5 license file.
D. Obtain the VMware vCenter Server 6.5 upgrade file.
E. Identify the IP address and root account credentials of the ESXi host where the new vCenter Server appliance will be deployed.
A support engineer is upgrading a PodFX 3.1 system to ACP 4200 4.0. When upgrading the HPE server firmware, the support engineer uses the iLO web interface's remote console to run the update tool. After several minutes, the engineer notices that the remote console does not show any display, and in the lower left-hand corner it displays "No Video".
Which statement describes the action that the engineer would take?
A. Using the iLO web interface, disable the server's screen saver function.
B. Using the iLO web interface, power on the server using the Power On: Momentary Press button.
C. Using the iLO web interface, reboot the server using the Power Cycle: Server Reboot option.
D. Use the remote control when it reappears after the server automatically reboots.
A support engineer is upgrading a PodFX 3.1 system to ACP 4200 4.0, and is upgrading the Extreme Network VSP switches to release 7.1.
Which two applications available on the on the MSC would the engineer typically use for the upgrade process? (Choose two.)
A. Avaya Orchestrator
B. PuTTY
C. WinSCP
D. Enterprise Device Manager
A support engineer logs into Avaya Orchestrator and clicks on the Service Availability icon for the Power Supply of a G450 device.
What information is the engineer looking for?
A. The current state of the power supply (OK, Warning, Unknown or Critical).
B. The amount power (in Watts) that the power supply is using.
C. A percentage breakdown of the state of the power supply (OK, Warning, Unknown or Critical) over a period of time.
D. A list of other services that are available for the G450 device.
What is the first step in upgrading the VSP switches in an Avaya ACP 4200?
A. Verify redundancy is active.
B. Power down secondary device.
C. Verify connectivity to NTP server.
D. Disable Telnet access.
Which two statements are considered backup strategy best practices? (Choose two.)
A. Create backups of the ACP 4200 system on the storage system inside the pod.
B. Do not backup to the ACP 4200 itself, backup to an external location.
C. No backups need to be made as the systems in ACP 4200, and the Pod are already reliable.
D. VMware snapshots are recommended for virtual appliance backups.
E. Determine business continuity, compliance, and regulatory considerations.
Which two upgrade tasks are required before upgrading the ESXi servers to 6.5? (Choose two.)
A. Upgrade the HP Server iLO firmware.
B. Upgrade the PDU firmware.
C. Upgrade the switch firmware.
D. Upgrade the HP Server firmware.
As an engineer working with the ACP 4200, you see that the backup plan in place for the virtual machines relies heavily on VMware snapshots.
Which statement describes Avaya's position on using VMware snapshots for a backup solution?
A. VMware snapshots are the most robust backup solution for the ACP 4200.
B. VMware snapshots should never be used as a backup and recovery method.
C. VMware snapshots should be stored off site to ensure business continuity.
D. VMware snapshots should be stored on the ACP 4200 they are backing up.
An ESXi Host server has been replaced due to a fault.
To provide for this replacement, which portion of the Lifecycle Workbook needs to be updated?
A. Power Cord Wiring
B. Serial Numbers
C. Network Data
D. Switch Wiring