Want to pass your NetApp Certified Implementation Engineer - SAN ONTAP NS0-520 exam in the very first attempt? Try Pass2lead! It is equally effective for both starters and IT professionals.
VCE
A customer has an FC host that needs to be attached to the NetApp AFF A700 dual controller storage cluster.
To accomplish this task, which three steps should the customer perform? (Choose three.)
A. Configure the FCP service for the node that has the LUN that is being accessed.
B. Confirm that the FC HBA driver and firmware is supported according to the Interoperability Matrix Tool (IMT)
C. Configure portsets to support the availability of multiple paths.
D. Configure an igroup with the WWPN from the host initiator for LUN access.
E. Confirm that the switch firmware is supported according to the Interoperability Matrix Tool (IMT).
An administrator needs to connect a new VMware 6.5 cluster to an ONTAP cluster for iSCSl connectivity. Which two steps would accomplish this task? (Choose two.)
A. Enable iSCSl adapters on the ESXi hosts.
B. Install the Virtual Storage Console for VMware vSphere.
C. Configure zoning for the HBAs and the ONTAP data LIFs.
D. Configure ALUA on the ONTAP SVM.
A customer wants to use both Cisco FC and FCoE switches in their ONTAP environment. According to NetApp best practices, what are two requirements in this scenario? (Choose two.)
A. You must use single initiator zoning.
B. You must create interface groups to isolate FC and FCoE LIFs.
C. You must create a trunk with multiple virtual LANs.
D. You must not have more than one target UF for the same physical port in a single fabric zone.