A large multinational corporation wants to implement SDN for rapid deployment of application
environments.
You are asked to define SDN service chaining for a presentation to execute management.
In this scenario, which statement would satisfy the requirement?
A. Integrated software is used to insert a software widget into the flow of network traffic.
B. Stacked hardware is used to insert a software widget into the flow of network traffic.
C. Software is used to virtually insert services into the flow of network traffic.
D. Hardware is used to virtually insert services into the flow of network traffic.
You plan to deploy a set of SRX Series devices in an active/passive chassis cluster with an active/passive network infrastructure. Which two statements are true in this scenario? (Choose two.)
A. End-host traffic is serviced through both SRX nodes during non-failure conditions.
B. End-host traffic is serviced through one SRX node during non-failure conditions.
C. In non-failure conditions, the end-host traffic across the fabric link is present.
D. In non-failure conditions, the end-host traffic across the fabric link is eliminated.
You are designing an IP fabric using IBGP as your underlay.
In this scenario, which statement is correct?
A. Confederations are not allowed in an IBGP IP traffic.
B. Route reflectors should be implemented on your spine devices.
C. IBGP ensures that traffic will be load balanced by default.
D. You must ensure that you have a full mesh with all devices.